Archive Tender
S. No. | Title | End Date | Details | Amendment/Corrigendum |
---|---|---|---|---|
41 | NIT regarding Infrastructure development of the University during 2021-22(S.H: Electrification works etc. of Library Building) | 15/07/2021 |
Download (192.94 KB) ![]() |
- |
42 | Renovation of toilets Saraswat Sadhana Sadan during 2020-21 (S.H Electrification Work etc.) | 31/07/2021 |
Download (274.73 KB) ![]() |
- |
43 | Sealed Quotations are invited regarding IBM Battery Unit Part for IBM Blade Chassis | 17/06/2021 |
Download (104.58 KB) ![]() |
- |
44 | Work Commencement letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) | 13/04/2021 |
Download (157.09 KB) ![]() |
- |
45 | Work Commencement letter in connection with the work of Infrastructure development work during the year section 2020-21 of the university (Sub-head: Supply, installation, testing and commissioning of net switches, data and power points etc. for networking | 13/04/2021 |
Download (136.38 KB) ![]() |
- |
46 | Work Commencement letter regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) | 13/04/2021 |
Download (131.14 KB) ![]() |
- |
47 | Work Commencement letter regarding regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 | 13/04/2021 |
Download (139.84 KB) ![]() |
- |
48 | Tender acceptance letter in connection with the work of Infrastructure development work during the year section 2020-21 of the university (Sub-head: Supply, installation, testing and commissioning of net switches, data and power points etc. for networking | 05/04/2021 |
Download (203.63 KB) ![]() |
- |
49 | Tender Acceptance letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) | 05/04/2021 |
Download (149.9 KB) ![]() |
- |
50 | Tender Acceptance letter regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 | 05/04/2021 |
Download (148.93 KB) ![]() |
- |
51 | Tender Acceptance letter regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 | 05/04/2021 |
Download (127.92 KB) ![]() |
- |
52 | Work Commencement letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) | 25/03/2021 |
Download (113.65 KB) ![]() |
- |
53 | Short NIT regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) | 30/03/2021 |
Download (143.44 KB) ![]() |
- |
54 | Tender Acceptance letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) | 19/03/2021 |
Download (115.88 KB) ![]() |
- |
55 | NIT regarding Full Service Maintenance Agreement (FSMA) for a period of one year of two Photocopier Machines (Canon iR-ADV 4525) | 15/03/2021 |
Download (587.71 KB) ![]() |
- |
56 | NIT regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 | 25/03/2021 |
Download (132.85 KB) ![]() |
- |
57 | NIT regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 | 22/03/2021 |
Download (109.76 KB) ![]() |
Corrigendum against the dates mentioned in the NIT Download (49.56 KB) ![]() |
58 | NIT regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) | 25/03/2021 |
Download (161.23 KB) ![]() |
- |
59 | Acceptance Letter regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) | 31/03/2021 |
Download (93.85 KB) ![]() |
- |
60 | Infrastructure development of University during 2020-21 (S.H S/I/T/C of Networking Switch, Data & Electric Points etc in Library Building & Shaikshnik Sadan | 19/03/2021 |
Download (865.42 KB) ![]() |
- |