Archive Tender

E.g., 27/07/2024
E.g., 27/07/2024
tender
S. No. Title End Date Details Amendment/Corrigendum
81 Work Commencement letter regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) 13/04/2021 Download (131.14 KB) pdf -
82 Work Commencement letter regarding regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 13/04/2021 Download (139.84 KB) pdf -
83 Tender acceptance letter in connection with the work of Infrastructure development work during the year section 2020-21 of the university (Sub-head: Supply, installation, testing and commissioning of net switches, data and power points etc. for networking 05/04/2021 Download (203.63 KB) pdf -
84 Tender Acceptance letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) 05/04/2021 Download (149.9 KB) pdf -
85 Tender Acceptance letter regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 05/04/2021 Download (148.93 KB) pdf -
86 Tender Acceptance letter regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 05/04/2021 Download (127.92 KB) pdf -
87 Work Commencement letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) 25/03/2021 Download (113.65 KB) pdf -
88 Short NIT regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) 30/03/2021 Download (143.44 KB) pdf -
89 Tender Acceptance letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) 19/03/2021 Download (115.88 KB) pdf -
90 NIT regarding Full Service Maintenance Agreement (FSMA) for a period of one year of two Photocopier Machines (Canon iR-ADV 4525) 15/03/2021 Download (587.71 KB) pdf -
91 NIT regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 25/03/2021 Download (132.85 KB) pdf -
92 NIT regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 22/03/2021 Download (109.76 KB) pdf Corrigendum against the dates mentioned in the NIT Download (49.56 KB) pdf
93 NIT regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) 25/03/2021 Download (161.23 KB) pdf -
94 Acceptance Letter regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) 31/03/2021 Download (93.85 KB) pdf -
95 Infrastructure development of University during 2020-21 (S.H S/I/T/C of Networking Switch, Data & Electric Points etc in Library Building & Shaikshnik Sadan 19/03/2021 Download (865.42 KB) pdf -
96 NIT regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) 12/03/2021 Download (158.4 KB) pdf -
97 NIT regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) 17/02/2021 Download (147.08 KB) pdf -
98 Award letter regarding regarding the outsourcing of Accounts and Income Tax work in the SLBSNSU,Delhi 31/01/2021 Download (70.49 KB) pdf -
99 Letter of Work Commencement regarding round “O” clock running, operation and comprehensive annual maintenance contract of 120KLD fab type sewage treatment plant of the University 31/12/2020 Download (74.9 KB) pdf -
100 NIT regarding Laundry/Ironing/Dry Cleaning services for linen, Blankets, Curtains, Rajai Covers, Pillow Covers, Towels, Door Mats etc. at Guest House 22/12/2020 Download (8.62 MB) pdf -

Pages