Archive Tender
S. No. | Title | End Date | Details | Amendment/Corrigendum |
---|---|---|---|---|
61 | Work Commencement letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) | 13/04/2021 | Download (157.09 KB) | - |
62 | Work Commencement letter in connection with the work of Infrastructure development work during the year section 2020-21 of the university (Sub-head: Supply, installation, testing and commissioning of net switches, data and power points etc. for networking | 13/04/2021 | Download (136.38 KB) | - |
63 | Work Commencement letter regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) | 13/04/2021 | Download (131.14 KB) | - |
64 | Work Commencement letter regarding regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 | 13/04/2021 | Download (139.84 KB) | - |
65 | Tender acceptance letter in connection with the work of Infrastructure development work during the year section 2020-21 of the university (Sub-head: Supply, installation, testing and commissioning of net switches, data and power points etc. for networking | 05/04/2021 | Download (203.63 KB) | - |
66 | Tender Acceptance letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) | 05/04/2021 | Download (149.9 KB) | - |
67 | Tender Acceptance letter regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 | 05/04/2021 | Download (148.93 KB) | - |
68 | Tender Acceptance letter regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 | 05/04/2021 | Download (127.92 KB) | - |
69 | Work Commencement letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) | 25/03/2021 | Download (113.65 KB) | - |
70 | Short NIT regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) | 30/03/2021 | Download (143.44 KB) | - |
71 | Tender Acceptance letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) | 19/03/2021 | Download (115.88 KB) | - |
72 | NIT regarding Full Service Maintenance Agreement (FSMA) for a period of one year of two Photocopier Machines (Canon iR-ADV 4525) | 15/03/2021 | Download (587.71 KB) | - |
73 | NIT regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 | 25/03/2021 | Download (132.85 KB) | - |
74 | NIT regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 | 22/03/2021 | Download (109.76 KB) |
Corrigendum against the dates mentioned in the NIT Download (49.56 KB) |
75 | NIT regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) | 25/03/2021 | Download (161.23 KB) | - |
76 | Acceptance Letter regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) | 31/03/2021 | Download (93.85 KB) | - |
77 | Infrastructure development of University during 2020-21 (S.H S/I/T/C of Networking Switch, Data & Electric Points etc in Library Building & Shaikshnik Sadan | 19/03/2021 | Download (865.42 KB) | - |
78 | NIT regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) | 12/03/2021 | Download (158.4 KB) | - |
79 | NIT regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) | 17/02/2021 | Download (147.08 KB) | - |
80 | Award letter regarding regarding the outsourcing of Accounts and Income Tax work in the SLBSNSU,Delhi | 31/01/2021 | Download (70.49 KB) | - |