Archive Tender

E.g., 28/03/2024
E.g., 28/03/2024
tender
S. No. Title End Date Details Amendment/Corrigendum
61 Work Commencement letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) 13/04/2021 Download (157.09 KB) pdf -
62 Work Commencement letter in connection with the work of Infrastructure development work during the year section 2020-21 of the university (Sub-head: Supply, installation, testing and commissioning of net switches, data and power points etc. for networking 13/04/2021 Download (136.38 KB) pdf -
63 Work Commencement letter regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) 13/04/2021 Download (131.14 KB) pdf -
64 Work Commencement letter regarding regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 13/04/2021 Download (139.84 KB) pdf -
65 Tender acceptance letter in connection with the work of Infrastructure development work during the year section 2020-21 of the university (Sub-head: Supply, installation, testing and commissioning of net switches, data and power points etc. for networking 05/04/2021 Download (203.63 KB) pdf -
66 Tender Acceptance letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) 05/04/2021 Download (149.9 KB) pdf -
67 Tender Acceptance letter regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 05/04/2021 Download (148.93 KB) pdf -
68 Tender Acceptance letter regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 05/04/2021 Download (127.92 KB) pdf -
69 Work Commencement letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) 25/03/2021 Download (113.65 KB) pdf -
70 Short NIT regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) 30/03/2021 Download (143.44 KB) pdf -
71 Tender Acceptance letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) 19/03/2021 Download (115.88 KB) pdf -
72 NIT regarding Full Service Maintenance Agreement (FSMA) for a period of one year of two Photocopier Machines (Canon iR-ADV 4525) 15/03/2021 Download (587.71 KB) pdf -
73 NIT regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 25/03/2021 Download (132.85 KB) pdf -
74 NIT regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 22/03/2021 Download (109.76 KB) pdf Corrigendum against the dates mentioned in the NIT Download (49.56 KB) pdf
75 NIT regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) 25/03/2021 Download (161.23 KB) pdf -
76 Acceptance Letter regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) 31/03/2021 Download (93.85 KB) pdf -
77 Infrastructure development of University during 2020-21 (S.H S/I/T/C of Networking Switch, Data & Electric Points etc in Library Building & Shaikshnik Sadan 19/03/2021 Download (865.42 KB) pdf -
78 NIT regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) 12/03/2021 Download (158.4 KB) pdf -
79 NIT regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) 17/02/2021 Download (147.08 KB) pdf -
80 Award letter regarding regarding the outsourcing of Accounts and Income Tax work in the SLBSNSU,Delhi 31/01/2021 Download (70.49 KB) pdf -

Pages